BYMARO, the Moroccan arm of the esteemed Bouygues Construction, proudly announces its appointment for the construction of the prestigious Mohammed VI International University Hospital in Rabat. With an anticipated completion date set for September 2025, this significant endeavor boasts a contract valued at approximately 450 million dollars.
Nestled in the heart of Rabat, the capital of Morocco, the Mohammed VI International University Hospital is poised to redefine healthcare standards. Comprising four six-storey buildings and a striking 25-storey tower, spanning over 275,000 square meters, this monumental complex integrates first-class healthcare and teaching facilities. Notably, the hospital will feature 553 beds and 20 operating theatres equipped with cutting-edge medical technology. Additionally, the educational infrastructure will include 15 lecture theatres, 72 teaching rooms, and 217 practical workspaces, all furnished with the latest audiovisual technology.
Designed by AIA Architects, the hospital is structured around three main components:
The tower, housing consultation areas, hospital and university administration, and teaching facilities.
The hospital, accommodates technical facilities, emergency services, diagnostic and interventional imaging, intensive care, inpatient wards, and logistics.
The university section is dedicated to lecture theatres.
This visionary project aims to align with national and regional healthcare policies, aspiring to set a precedent for future university hospitals in Morocco, both architecturally and in terms of care and education quality. Pursuing Exceptional HQE certification, the teaching component will incorporate 8,800 m² of photovoltaic panels generating 2 MWp, covering over 10% of the site’s energy needs. Moreover, the chosen design is projected to reduce carbon emissions by over 40% compared to industry benchmarks.
During peak periods, the project will mobilize 3,500 site workers, including subcontractors. This ambitious initiative marks BYMARO’s third hospital project in Morocco within the past five years, following the successful completion of the Mohammed VI University Hospital in Bouskoura in 2019 and the ongoing construction of the Smart Health Care City in Benguerir, underscoring the company’s expertise in healthcare infrastructure projects.
For more information please visit: https://www.bncnetwork.net/
About the Author
Reprinted with the permission of BNC Network - www.bncnetwork.net
Source: BNC Project Intelligence
©2004-2023 Industry Networks (FZC). All rights reserved.
- BNC NETWORK
- BNC NETWORK
